Hi,
My client has a requirement like there will be a material with "n" number of batches. There may be 30 characteristics attached to the material at plan. Now they want to skip the characteristics or vary the characteristics during inspection. I understand DMR is the option, applying which this can be done. But I am unable to understand that how to apply DMR to get the desired result.
For example Material M has following batches with varying MIC's:
1. MB1 (a q w e r t y---> characteristics or MIC's)
2. MB2 (a q w )
3. MB3 (q w e)
4. MB4 (a q w e r)
5. MB5 (e r t y)
6. MB6 (w e r t)
7. MB7 (a q w e r t)
Mentioned above is the scenario how they want QA Plan to be configured. Going through DMR I didn't understood what do we mean by stage. What is No. of inspections & new inspection stages in "OK" & "NOT OK".
Kindly help.
Thanks,
Rahul