Hi all,
i am trying to create a process flow for a subassembly to route external for an activity and be inspected when we receive it back. To accomplish this i am packing the SA into a handling unit, creating a UB sto and packing the batch onto a delivery which i am receiving back again into same plant. However even though i have 01 setup with HU managed and an inspection plan configured it will not generate a 01 inspection lot on goods receipt and product routes into Unrestricted. The migo receipt screen defaults to Unrestricted and when i change this to QI it does route to QI but without an inspection lot. The goods are being received in using 101 movement type and the handling unit is available. See inspection setup below.
Where am i going wrong?
Is the process fundamentally flawed?