Hi,
Is it possible to combine SAP QM Dyn Modification Rule and Material Revision Level in Incoming Inspection?
Ex:
1. Mat X Vendor 1 Rev A first Good receipt results in positive Usage Decision.
DMR for this Mat X Vendor 1 combination is defined to skip inspection for all the future GRs for Mat X Vendor 1 after 1 positive UD.
Result is that 2e GR for Mat X Vendor 1 will be skipped and send to unrestricted stock.
2. Mat X Vendor 1 Rev B is delivered to the plant and needs to go through inbound.
My company wants to assure that the change of the material revision level results in a reset of the DMR (read Quality Level) of that Mat X vendor 1 combination.
Question:
Is it possible to have a reset of the Quality Level when new Rev level is being received?
We know we can conduct this using the quality inforecord, but we want to avoid using this QIR because the change to "skip" in the QIR is a manual action.
Thx to let me know!