Quantcast
Channel: SCN : Unanswered Discussions - SAP ERP Operations - Quality Management (SAP QM)
Viewing all articles
Browse latest Browse all 2508

Dynamic modification rule not working in skip stage

$
0
0

Hello Experts,

 

The material and plant , has assigned an inspection plan, , which has a DMR rule at lot level, the rule says that  in inspecting only the first lot will go for UD, and if the first lot is accepted, the rest are skip stages. It was inspected for the first time, So now for second time it should be in skip stage and should not be necessary to be inspected, but the inspection lot is created and the material entered keeps as blocked in Quality inspection in MMBE. the status of lot in QA32 is REL SKIP , the RR is also not possible as the screen is gray out. we have check the setting in material master for control insp. lot and it is for each material document item.

 

How to restrict it? can you please help me.

 

Regards,

Dev


Viewing all articles
Browse latest Browse all 2508

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>