Hi All,
I want to know the QM-Notification process at raw material inspection, in-process inspection and finished goods inspection.
Example: what are the necessary configuration required, any additional add-on's or standard SAP will do...? Notification is created while RR or UD..?
Important field i should maintain for creating a notification..?
Scenario for Inprocess inspection is- say X product is manufactured (tolerance 10mm-14mm), if the specification exceeds 14mm and the RR is done under rejection, then how the notification is raised for the production department..?
Regards,
Santosh