Hi Gurus,
I am creating inspection lot by doing Raw material GR. in material master i have maintained the data like inspection with material specification,
but i have Not Maintained any specification for this material , so as for the standard behavior insp lot need to be create with CRTD status, but hear it is created with REL status.
i have tested the same scenario in my QAS there INSP lot created with status CRTD, but the same in DEV it created with REL status, can anybody let me Know , what is the configuration needed to control this .
Regards,
Mahesh.