Dear Experts,
I have one FG material which already having a inspection plan from valid 01.01.2015 to 31.12.9999
But now I want system to consider a new inspection plan valid from 15.03.2015 to 31.12.9999
Please guide me how we can achieve this.
Thanks
Abu