Hi Gurus,
I have assigned source inspection in material master QM view. I have maintained quality info record (see attachment1). I have maintained procurement active indicator. I have also maintain control key as below (see attachment2). I have not maintained 01 Inspection type in material master.
My requirement is
1. if source inspection rejection happens, new inspection lot should be create using QI07?
2. After MIGO system creating inspection lot again. It should not generate??