L.S.
Here at our customer we have a return process where standard MVT 651 is used. We want to have the option that goods, with quality, are posted using a MVT655.
At first we would like to create QM entries for this material, but the question is if this works when the system detemines a 651 movement. Is than automaticaly a 655used depending on the quality control parameter 06 in the quality view of this material?
Or is is better to modifiy the positiontype so, via the scheduling type, a 655 is defined via this.