Hi,
Let's assume I have an inspection plan and want to assure that one operation is finished before the other becomes active. Is there a way to do this? If the answer is yes, how do I do that?
To talk about an example, please see the picture attached. In this case operation 0020 should not be active before operation 0010 is finished.
Hope someone can help!
Kind regards
Michael