Hello,
I am an ABAPER trying to debug an issue in QM. In some cases, when a sample-drawing instruction is printed the inspection operations under 'Distribution of samples to the laboratories' are printing in the wrong sequence. For example, operation 20 is printing before operation 10. I have found fields in QAMV (POSNRPRZV) and QPRVP (PROBNRPL) that appear to be sequenced incorrectly but I have not been able to determine where these values are created or maintained.
Any insight to this issue will be greatly appreciated and points will be awarded.
Thank you,
Pat Holland