Quantcast
Channel: SCN : Unanswered Discussions - SAP ERP Operations - Quality Management (SAP QM)
Viewing all articles
Browse latest Browse all 2508

Skip inspection lot at material & batch level:

$
0
0

Hello All,

 

My client requirement is as follows for Skip inspection lot at material & batch level:

 

There is P.O. of 250 quantity. When supplier ship the goods he splits this qty into 10 shipments. This means there are 10 GRN of 25 pcs. Out of 25 pcs only 05 pcs are inspected.

 

So client want that whenever there is first GRN of 25 pcs, inspection lot should get generated & 05 pcs will be inspected for this batch. If the inspection is ok (Lot Accepted) then whenever there is next GRN for the same material & same batch inspection lot should not generated & material should directly go to UNR status.

 

In short for same material & for same batch only, first time GRN, lot should created in the system. From second GRN upto last GRN of same batch & same material, lot should not get created.

 

If there is rejection for first GRN then for 02nd GRN, lot should be created.

 

How we can achieve this? What configuration & master data is required to maintain at material & batch level.

 

Thanks.


Viewing all articles
Browse latest Browse all 2508

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>