Dear SAP,
User have a requirement that once the inspection lot get generated User should able to post the sample Qty before UD, But the Stock Posting should allowed after UD.As user is afraid that while sample posting tester should not release the batch, so he want such kind of control.Also tell is possible at plant level.Please explain.
Regards,
Asif