Dear Sap Geniuses
I have an issue for one plant we are STO goods into and we are also procuring the same materials off vendors. So 08 gets generated for the STO and 01 lots for the direct PO's easy. Problem is the one plant they are coming into is set up into 4 different Storage locations and they will always go into Pole 38 location before coming up into the actual production sloc so the 08's are popping up all over the place. Is there any way to change the control inspection lot to be plant material and batch based instead of material, batch and Sloc based. Any help would be great thanks.