Dear All,
It would be great if you could help me.
Retesting material to be link with UD date of material , Example material GRN prepared on 11/9/2015 and UD given on 1/10/2015 than re test date to be 1/10/2016 and not 11/09/2016.
1. Material received in plant A, GRN prepared on 20/6/1014
2. 365 days inspection interval;with QA07, retest date lot created on 13/6/2015 7days advance
3. Same material stock transfer to plant B on 6/10/2014 & released on 17/10/2014
4. In B plant re test should be on 17/10/2015 but as material take first consignment received date i.e of plant A
5. Due to this retest date in plant JB03 is 13/6/2015 instead of 17/10/2015
Note As this relected in batch MSC2N this is batch wise master and not Plant wise so if any changes made in batch reflected to all plant.
It is taking data from MCH1 table instead of MCHA.
Most of the pharma company has this requirement but i dont know how do they manage.
Regards,
Viral Shah