Hi All ,
I am performing following test for inprocess inspection :
1. Assigning inspection point 150 - Generate inspection point time, qty wise .
2. Partial lot assignment = PArtial lot assignment according to plant default
3. Against operation control key , under Quality related parameters :
a) radio box "Time related " is checked
b) Time factor 1 Day
4. Now I am creating an Production order using CO01 of qty 122 with start date = 27.10.2015 and end date = 19.11.2015
5. On releasing the order , inspection lot gets generated.
6. While recording results when I clicked on "Assigned insp. pt" button system proposes 3 points :
17.11.2015
18.11.2015
19.11.2015
Why so ideally it should create 1 point for each day starting from 27.10.2015 to 19.11.2015