Dear Experts,
I have a issue with incoming inspection lots.
Case is as below:
I have Vendor : V and Material : M
one scheduling agreement - SA
done GR of SA to create lots.
1st GR done for M and V - Lot created IL1 with status : CRTD PASG SPRQ
After 1 minute,
2nd GR done for M and V - Lot created IL2 with status :REL CALC SPRQ QLCH
So the problem is with the first lot- why it dint come to REL status automatically
Even though the Material, Vendor, Inspection plan is same for both the cases.
Plan got assigned in both the cases but one was in CRTD status but other is in REL status.
We are using Dynamic modification rule also. i am not sure whether that would be linked with this thing some where.
Because in the first lot IL1 under "Plan assigned" tab - no DMR details appeared.
but in the second lot IL2- under the tab "Plan assigned" DMR details appeared.
Thanks
Navdeep