Hi gurus,
At the end of a materiel production, I want the isnpection lot to be delayed by a certain period depending on the material, 72/48/24 hours, before having an inspection type 04 GR and begin the Quality process.
The thing is, The products should wait a certain period of time before inspection and getting into storage location in my warehouse.
Thanks,
CHAHIL Mohammed