Hi Team,
I have one header material HD1 and material CMP1 is as component in process order. There is a common MIC lets say MIC1 in the inspection plan of both the material. CMP1 has been inspected and used in process order . Now we do the GR for header material HD1 to get another 04 lot.
Here I want inspection result of MIC1 to be passed from CMP1 to HD1 material. Is it possible to do this in standard SAP system ?
Thanks
Ravi Bhushan