Quantcast
Channel: SCN : Unanswered Discussions - SAP ERP Operations - Quality Management (SAP QM)
Viewing all articles
Browse latest Browse all 2508

passing the inspection results from component material to header mterial

$
0
0

Hi Team,

 

I have one header material HD1 and material CMP1 is as component in process order. There is a common MIC lets say MIC1 in the inspection plan of both the material. CMP1 has been inspected and used in process order . Now we do the GR for  header material HD1 to get another 04 lot.

 

Here I want inspection result of MIC1 to be passed from CMP1 to HD1 material.  Is it possible to do this in standard SAP system ?

 

Thanks

Ravi Bhushan


Viewing all articles
Browse latest Browse all 2508

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>