Quantcast
Channel: SCN : Unanswered Discussions - SAP ERP Operations - Quality Management (SAP QM)
Viewing all articles
Browse latest Browse all 2508

When material get quality inspection status ,is it out of MRP run?

$
0
0

Hi,dear SAP QM experts,

 

I met a question ,when material get quality inspection status ,is it out of MRP run or I can set customizing by SPRO to define the MRP scope?

 

when GR 10PC trigger a inspection lot for  material  FG,the material FG get the quality inspection stock 10PC and how the quality inspection stock will  run in MRP  ?

 

In my opinion ,the 10PC FG  should out ot MRP supply of the material ,no matter what ,the material is in the quality inspection room ,normally  the inspection given a time limited ,however ,if all the material  is scrap?

 

I think the quality inspection stock and the block stock should out of the MRP supply run from this business consideration.

 

Thank you!

 

Best wishes!

Miriam Zhao:


Viewing all articles
Browse latest Browse all 2508

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>