Quantcast
Channel: SCN : Unanswered Discussions - SAP ERP Operations - Quality Management (SAP QM)
Viewing all articles
Browse latest Browse all 2508

Transfer posting of stock from QI to QI with in plant

$
0
0

Hi ,

 

Is that possible to perform transfer posting for the material which in in QI stock from one storage location another storage location with same QI status

 

eg: 100 kg of material is in storage loaction ABC under QI stock and it has to be transfered to CEB storage location with same QI status

 

I have tried the movement type 323 but getting an error message "transfer posting is possible through Quality transaction only "

 

Without performing UD is that possible to transfer the material for the above scenario ?


Viewing all articles
Browse latest Browse all 2508

Trending Articles