Hi All,
We have a failure situaiton in a Z-transaction in QM which combines 2 std lot to form one z-lot based on each vendor batch received on a given day.
What actually happened is when we post UD , Header lever UD has been posted successfully but UD for one of standard lots has got failed and hence stock remains in QI for that particular standard lot.
When we tried to process UD again , the system shows the following message.
Error during quantity posting for inspection lot xxxxxxx, manual proc. required |
Message 054.
What would be possible reason for this and how to correct the issue.