Dear sir,
The In-process inspection lot where the QM01 control key Operation missing in inspection specification.
But in the routing the operation is maintained and characterstic also available.
Thanks and Regards.
Vishnu Ravi.
Dear sir,
The In-process inspection lot where the QM01 control key Operation missing in inspection specification.
But in the routing the operation is maintained and characterstic also available.
Thanks and Regards.
Vishnu Ravi.