Hi,
I have the following issue.
Master DATA:
Semifinished material with Inspection Type 0130 at material master QM view.
Semifinished material with usage 53 inspection plan.
I create a subcontracted PO (ítem category L) for the semifinished material and when I do the GR via MIGO, the system doesn't create any inspection lot for the semifinished material.
Thanks in advance.