Hello All,
An inspection lot has been created for x ingredient, but this ingredient was by mistake assigned to 2 different inspection plans: Group A and Group B, no specification has been assigned. Status CRTD CHCR SPRQ appears and no specification was assigned. I removed group A already.
How can I add the missing specification in such case? (Note: the button "task/list spec" is not available/is in display mode)
Thanks,
Naresh