Hi
We have assigned 04 type Inspection for a material with the fields Insp with Task List , Automatic Assignment, and Check Chars unticked in QM view material master. Hence only usage decision is required for such inspection lots, no need to do Result recording.
The material is batch managed and confirmed through CO11/CO11N.
Inspection lot is generated with status as REL CALC SPRQ PAOR.
My query is how to avoid the inspection lot status PAOR.
Please note that the above inspection lot status is only coming in case of material without any Inspection plan or material where no inspection result recording is required.
I am facing the following Issue while Doing Usage Decision :
Because the inspection lots with status PAOR is creating problem while doing UD through BAPI_INSPLOT_SETUSAGEDECISION. We have developed a tool by using the above BAPI to carry out mass usage decision. But only in case of such lots with the status REL CALC SPRQ PAOR system is throwing error message:
Operation QM20 not available for this lot.
But usage decision for such lots can be done through QA32/QA16 .No issue comes in QA16 or QA32.
So please let us know is there any way to avoid the inspection lot status PAOR.
Regards
DD