Hi,
I am having issue with Material Specification for material which is used in two different plants. Scenario is as follows.
I have raw material in two different plants lets say plant 1000 and Plant 1100. When this raw material is received from vendor it undergoes Quality inspection.
In Plant 1000 we check pH of the material and in plant 1100 for the same material we check Viscosity that means we will check different MIC's in different plants. We are using Material specifications instead of Inspection Plans due to data maintenance issue
We created Material specification as follows.
Now when I create Inspection lot in the plant 1100 in the inspection lot both MIC's are coming instead of MIC of 1100 i.e. VISCOSIT as shown below. Requirement is corresponding plant MIC' should be selected in the Inspection lot in that Plant. How to do this.
Thanks
Kumar