Team,
For the Same material-Same tak list group,below is the very critical issue we are facing from the client .Please guide us.(Not able to find the root cause due to the Dynamic Modf Rule or Material Rev level-Task list combination)
case1: Material:67515 / Insp.Lot 10000099173 / 01 inspection type / Insp.Lot in QA02 REL CALC SPRQ
Insp. strart date: 08/31/2016 ; End date: 02/09/2016
when task list displays: No operation-MIC valus have been displayed./ providing insp.plan created details.
Trying to Record the results for the lot displays the erreor message:
case2: Same Material:67515 / Insp.Lot 80000016669 / 08 inspection type-322 mvt type / Insp.Lot in QA02 REL CALC SPRQ
Insp. strart date: 08/31/2016 ; End date: 02/09/2016
displayed task list (Operation-MIC) when verified from Inspection lot(QA02):
Observations:
1. 01 inspetype and 08 insp.type inspection lots - for same Material revison levels are "Blank & 00."
2. Verified that No change number exists at plan level.
3. Dynamic Modification Rule is assigned as below.