QE51N: Required Characteristic Closed as Accepted Without Result

$
0
0

Hello forum.

 

I have a required characteristic with a fixed scope and subsequent characteristics dependent on the result of the first (must answer "Yes"  - required when controlling characteristic is accepted).

 

I have a user who enters the number inspected into the inspected column, selects all characteristics, and unlocks to get to the dependent characteristics.

 

Step 1.jpg

 

Then the user enters results for the dependent characteristics, without completing the first, and selects "Close".  This is closing the required characteristic as accepted with no value entered.

Step 2.jpg

Is this normal / expected behavior for required characteristics to be able to be closed with a valuation of accepted without results as long as the number inspected has been entered / adhered to?

 

Thank you in advance,

Cristin