Dear Expert,
I am having a scenario of 1 in-process operation of melting molten metal in routing.There are 2 melting furnace capacity of 12 ton each where user take 3 samples of melting metal from each furnace.After that again they take 3 samples by mixing both the furnace melting metal for testing chemical and others properties for the molten metal.So there are total 9 inspection lot for this 1 in-process operation.3 samples for each 2 furnace and 3 for the mixture from both the 2 furnace.
So do let me know how to map this process in standard.I am aware of the master data setup required for it i.e MIC,assign MIC in routing QM operation and so on.
Thanks in advance.
Regards.
Swapnil Rajane