Hello.
Is it possible with standard SAP when it is create the first inspectio lot for material/vendor ( origin 01) that it takes an inspection plan, and for the next inspection lot that will be created for the same material/vendor ( origin 01) that system takes from another inspection plan ????
Or have i to user a badi/user-exit?? which?
Regards.
Antonio