I am also using functional location and using the PM as a task list to generate an inspection lot (14). However, I am having issues getting the inspection lot to have a end date. The lots are only generating a 0 day cycle time for the lab.
↧
I am also using functional location and using the PM as a task list to generate an inspection lot (14). However, I am having issues getting the inspection lot to have a end date. The lots are only generating a 0 day cycle time for the lab.