Hi Friends,
I am facing an issue with VC part, please
provide your inputs.
Scenario: We have material sub contracting
process with VC.
Creating a PR, then convert to Purchase order. While doing the GR, system is
creating a Quality lot as per the Inspection Plan.
Requirement: We
maintained a Variant table, while creating PR, system is picking the values
from my variant table but At the time of Quality lot generation, It is picking
it from Quality lot. We want system to pick the values from the Variant table.
Process we are following:
Maintained the Variant table and all VC
settings
Created Class characteristic: We don’t want
to maintain the
values in Class characteristic, so we left it blank, It has to pick it from the
Variant table. Char format is ‘NUMBER’
MIC: Creating an MIC with reference to the
Class
characteristic, Control indicators are coming blank, (this might be the issue
we are anticipating)
Maintained Inspection plan with spec limits
While doing the GR for the Purchase order,
system generating
an inspection lot but it is coming from the Insp Plan not from the Variant
table.
Regards