Dear All,
I have created single inspection plan for many existing raw materials. Now it has been found that each raw material have different revision level as well as valid from date.
My inspection plan is created on 02.07.2014 and each raw material has different revision level with valid from date which is also very old (like 11.03.2012 for revision level 09).
My Requirement is: how to correct my inspection plan?, so that it will work for each assigned raw material and there will not be any material revision level wise problem created for the inspection lot so that my inspection lot should be created in REL status in QA32 transaction i.e. inspection lot is assigned automatically as per standard SAP functionality.
Thanks,
Narresh