Quantcast
Channel: SCN : Unanswered Discussions - SAP ERP Operations - Quality Management (SAP QM)
Viewing all articles
Browse latest Browse all 2508

Change Inspection typ and keep inspection stage of dynamic modification

$
0
0

Hello,

 

Our QC departement splitted into 2 departments and each got their own materials to check.

Now both material groups will get a different inspection typ B and C instead of the old insp Typ A.

 

We use dynamic modification rules and all materials have their inspection stages based on vendor and insp. typ. There is only 1 plant.

 

When I assign a new insp. typ B or C to a material the next inspection lot of course will generate a new record in QDQL starting with the lowest insp. stage. But I need the last stage of the old insp typ A!


Copies of records A to B and C in QDQL are not so easy because vendor and inspTyp are not part of the key and SAP uses a counter instead.


Any ideas how to get the old insp. stages to the new insp types in the quality level?

 

br Gerold


Viewing all articles
Browse latest Browse all 2508

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>