Hi Gurus,
i have cerated MIC and Created A Inspection Plan For the Raw Material And Assigned The MIC in Inspection Plan. and completed a cycle of result recording and ud.
later i came to know that Inspetion plan is onely for Routing. then how can we Assign the MIC" s To raw Material ?, as this is basic question but i am not able to understood the stuff in internet.
Regards,
Venkat.