Quantcast
Channel: SCN : Unanswered Discussions - SAP ERP Operations - Quality Management (SAP QM)
Viewing all articles
Browse latest Browse all 2508

In process Inspection behaviour?

$
0
0

Hi, I have setup a material with Inspection type 03 and when ever a production order is released a Inspection lot is created and it is in released status, it will be open until the Inspection sample get tested. My question is If i go ahead and close the production order before the Inspection sample result came to me for entering the result and make UD, will there be a issue. As far as I tested I closed the production order and later I took the lot and entered the result and made a UD for that lot. I have a doubt if this will be a issue at any point. Please let me know. I'm having this question because when a material is set up with Inspection type 03 and 04, it caused a error when closing the production order saying that they are open inspection lots.

 

Please suggest me.....Thanks


Viewing all articles
Browse latest Browse all 2508


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>