Hi QM experts,
First, I have some problem about QM control chart.
- What parameters in sampling procedure could I use for control chart?(Only "Sampling type=Fixed sample", "Valuation mode=SPC inspection"?)
- When I use "Control chart type=165 Shewhart chart for p / USA" in sampling procedure. I just can see one inspection lot result in the control chart. How could I run control chart for several inspection lot in the same time.
Second, I'm trying to use QM to control hazardous material.
- I want to attach some document files to inspection lot that provided by vendors before creating PO, could I use certification type or tech. delivery terms to realize this scenario.
Many thanks
Ming