Hi all,
I created inspection plan for one material, the inspection plan has two operations, operation 1 has two inspection characteristics assigned and both are assigned a sampling procedure of fixed sample of 9. Operation 2 has one inspection characteristic and sampling procedure is fixed sample of 5.
Now when inspection lot created, the sample quantity is determined as 18, per my understanding it should be 9 which is the largest sample among the 3 characteristics.
Can anybody explain me the logic of sample calculation based on sampling procedure?
Thanks
Danny