We partially set up QM requirements for a material we shipped to another plant before catching it was incomplete. An 06 inspection type should have been the only type, but several other inspection types were pre-loaded in MM02 in error. None had inspection plans, tasks or characteristics assigned.
The long-term process wanted is for it to go to inspection stock, but release through MB1B. Is there a way to do a simple UD out of 01 without fully setting it up? To me, I'd think we'd want the 01 anyhow for this very reason of 101 movement type purchase order receipts. But I'm new to this topic.
Thanks in advance