Hi gurus,
We've created a standard stability study in our SAP but it does not work according our expectation.
It was made all steps correctly and the JOB (transaction IP30) was scheduled.
The problem is:
There was a change in the Inspection Plan status, from “04 - Released (general)” to “01 – Created”.
The system did not take it into account and generated the Inspection Lot normally with status REL-Released.
In our opinion the system should create the inspection lot with status CRTD instead REL.
I was wondering if you could help us to identify any master data or customizing setting that could be missing?
Best Regards,
Cleber