Hello!
We have a kind of inspection (layout inspection) that must be performed one time per year (normally) for each product manufactured. Well, I was thinking to use inspection type 09 (recurring) but sounds that everything is based on the batch date (next control date of the batch). Then I believe that it's not exactly what I need because the layout inspection must cover the procces and the characteristics of the product in the prodction line at this moment. I will not to inspect a old batch produced one year ago. I need to inspect the product that is working now, with more details (one time per year) that the regular quality control.
It's like to create a manual inspection lot based on a specific inspection plan. But I would like to know if is there a standard treatment to this issue.
Thank you.