Hello Experts
I have just come across a requirement and would be grateful if someone can help me out in this regard
1. Industry : Aerospace and Defense
2. Products : Electronics Cards Assembly
Inspection type : 03 for Control in Production
In standard SAP, we could confirm operations during Results recording for one operation. For Inspection Points, when you record te results the system asks also to confirm produced quantities and labour time.
The requirement is in the contrary way : Record the results during operations confirmation. The Operator in charge to perform the assembly has to perform quality control also. Then instead to go in QE51N or QA32 to record results and confirm operations, he should be able to do the same while being in CO11N (tcode for confirmation).
Anybody should have an idea about how to set up this business rule in SAP.
Regards
Patrick