Gurus,
we are working with partial lot creation & batches for in-process inspection.
So, I created production order , entered 2 inspection points, then I assigned each inspection point a partial lot & a batch number to that inspection point until all confirmations are done.
so Now the total yield of production order is 2 pieces where 1 piece is assigned to batch 400 & 1 piece is assigned to batch 401.
but when performing goods receipt for the production order the system doesn't recognize the 2 already created batches, instead the system creates a new batch "403" for the receipt of the 2 pieces.
So, how can I receive batches 400 & 401 that was created by QM ??
any suggestions??