Hi all,
I'm very confused on the use of dynamic modification rule in inspection, I understand the concept of dynamic modification which provides more flexibility for inspection work. but my question is: how are the different severities reflected at different stages? i.e. at beginning we are at stage 100 which is normal inspection. As soon as there is one inspection lot that was accepted as OK, as per dynamic modification rule, it will go to stage 200 which is reduced inspection. but what will be the difference for the next inspection lot? the system will reduce the sampling quantities?
I know there is sampling scheme that is functioning behind the dynamic modification rule? can anybody tell me how does it functioning?
very much appreciated!