Hi Experts:
My customers want to use a quarantine Time per material. It's possible?.
The possible solution that I reviewed was:
1. Mark the Material with Automatic UD
2. Configure SPRO-Quality Inspection-Inspection Lot Completion-Plan Automatic Usage Decision the Waiting Time (mins)
3. Plan the Job to make the UD
But this solution is only per center, not per material.
It's possible to configure a material with a quaratine time??? Thanks a lot