Quantcast
Channel: SCN : Unanswered Discussions - SAP ERP Operations - Quality Management (SAP QM)
Browsing all 2508 articles
Browse latest View live

Issue with Inspection Type 15

Hi All, Good day! I have the following problem with regards to creating an inspection lot of type 15 for Reserve Samples. My client created a Reserve Physical Sample with a lot quantity of 100 Grams....

View Article


No serial numbers reflected in stock while posting UD

We have a serial number profile where we identify serial numbers at Results Recording,rather than at GR for PO.So the profile has QMSL and no MMSL. While posting UD, the stock doesnt have the serial...

View Article


1 class characteristic, 1 MIC with multiple inspection plans

Hello SAP Gurus:I have searched the SCN database and reviewed the various questions and answers but I have not been able to find a good answer to my issue. Here is the scenario: I would like to have 1...

View Article

Annual reserve samples inspection

Hi My client has a specific scenario. We are pulling reserve samples when we do production through our process order .As per our regulation, we need to do the annual inspection of the reserve sample...

View Article

Stock does not change after usage decision

Hi experts, I performed usage decision for an inspection lot with following valuation results: Valuation Code - Accepted (OK)UD code - A2 01Quality score - 80Follow-up actn - MANUAL  But the material...

View Article


Mass Change for Quality Levels for Characteristics Level

Hello Everyone, Is there a way for us to change the quality level of the materials which have inspection plans with Dynamic Modification at Characteristics Level. I am thinking of using LSMW and use...

View Article

Stock posting to new material after UD

Hi experts, i need an automatic stock posting to a new material depending on the usage decision code.Code A -> post to Material ACode B -> post to Material B I know the possibility with that pop...

View Article

Activating new field for UD in QA32

Dear All, As per the client, two new fields(ie., Rejection and Rework) is to be added for making UD in QA32 t.code. The reason is my client wants the two new fields for tracking of material status and...

View Article


background jobs copy???

Hi Experts   I have a need to create / schedule several background jobs in one client and they need to be created again in another client.  Can they be copied from one client to another or simply name...

View Article


LSMW Multiple Line item upload

Hi Experts, I know to use LSMW FOR Batch input recording for all the masters in variousmodules. The problem is with transaction data like sales order , where for 1order there are many line items . how...

View Article

Limit values/selection on QA10L

Hi, Does anyone know if it is possible to limit the values displayed in QA10L (log of automatic UD's)?Or if there is a selection screen you can activate somewhere where you can filter on date?Right...

View Article

Material coding for material from differnt vendors

A material is procured from differnt vendors. Material sourced from some vendors are registered for one header material and all vendors are registered for second header material. Should I maintain...

View Article

Defective quantity to be updated in notification based on result recording

Hi all,I am stuck up with one issue. Issue is . I have a inspection lot of 10 quantity. out of that 5 quantity is rejected based on recorded results.I have activated defect on the characteristics, and...

View Article


Quarantine Time

Hi Experts:My customers want to use a quarantine Time per material. It's possible?. The possible solution that I reviewed was:1. Mark the Material with Automatic UD2. Configure SPRO-Quality...

View Article

Image may be NSFW.
Clik here to view.

Issue during result recording

HI Folks, I am facing issue during saving the results for a inspection lot, as shown in below screen shot.I have checked all configuration which I think is fine, the strange behaviour occuring only...

View Article


Inspection lot with 01 origin for stock transfer (Intra company STO)?

Hi Sap Gurus, As per standard SAP configuration for 101 movement type, 08 is the inspection type used for stock transfers (Intra company STO). But, there is a requirement from business to use 01 for...

View Article

Inspection lot stock tab in 103 mov. type

Hi all, we have 2 step scenario of incoming materials.1. Do GRN by mov. type 103, Inspection lot generated, Result Recording & Usage Decision After Usage Decision Accepted then 2. Store keeper do...

View Article


Material moved from Restricted with no QM Tx involvement

Hello Experts, I've a very unusual situation I need explained if possible. I pose this scenario: Incoming material is received via Mvt 101 >  Inspection 01 takes place > material is UDed "SCX"...

View Article

Issue in Inspection Lot with Inspection Type 04

Hi, We have Inspection Plan defined with multiple operations, each operation has MIC assigned. For one MIC the control Indicator in Inspection Scope was Set as Scope not Fixed.While performing result...

View Article

Notification Workflow

Hi all, there is one requirement from  my client that when they save any notification , a mail should be triggered in their boss's  personal email.  I have tried for workflow, but its not working....

View Article
Browsing all 2508 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>